Aclaración/resumen:Computer-based, for application on industrial bases builder
Noy organizations or directly on building projects.
Descripción completa de la marca:Do not require to accommodate large area.
consists of coarse blocks of fabric availability, is ñáîðíî- the time
boron. Exits into two executions: summer and winter.
for mounting and dismounting is required a little time, what makes setting
SIF of convenient for use on various objects.
is capable make to up as the conventional concrete mix, and with ïðèìåíåíè
EM chemical agents, may function as a in automated fashion, so
and in manual mode with operator console.
for inputting of directive in operation the connecting ýëåêòðîýíåð
ãèè, water is required and (for winter alternative) para.
directive foundation the welded frame serves as, at which are mounted the cockpit
operator, the mixer, the tractors and dosing of materials et al
with aims of providing of high wear resistance the mixer is constructed of
armor steel. The nonreactive aggregates are stored in or in fan warehouse (the year
Nia the alternative), or in heat-assisted the weighing bunker, 4 section
with ïàðîïðîãðåâîì, the section volume - 9ì. Cuba. (winter alternative). For çàãðóç
filling materials SIF in compartments of bin are being applied the type loader of Ò018 with mi
íèìàëüíîé hoisting depth 2, 5 M. The cement is saved in two silages of åìêîñ
Ti on 65 tons, whence through augers and the weighers shall be submitted
in mixer. The silages filling by the cement is transacted through ñïåöèàëü
Noy devices from àâòîöåìåíòîâîçîâ. |
in operator cabin there is controllers of components dosage
and management bodies of all setters.
in automated fashion the operator with desk determines order parameters (led
the doses rank, the mixing time, the batches number of). Hereinafter all working
the processes of preparation of concrete stem tacitly in íåîá
õîäèìîé sequence.
after issuance specified number of batches the cyclic process ïðåêðà
ùàåòñÿ and on console of operator bursts into flame signal lamp.
the directive Êîìïëåêòèöèÿ on consumer requirement may be changed.
assembling and the directive debugging are accomplished by the specialists forces of plant.
installation output (+2. +40 celsius hail), M.. Êóá/÷àñ 32
mixer capacity on load, l 750
volume of ready batch, l 500
mixing time, sec 30. 40
capacity of cement silos, t 130
weighers of inert and binding materials, type weight
gauges of water and additions, type three-dimensional
supply voltage, in 220/380
maintenance staff, human being 2 |